You are here
Home > Executed
S. # General Description of Works Name of Client Date of Completion
1 Civil & Earth works at Tajjal & East Sindh Concession areas on call-out basis

 

ENI Pakistan Limited September-2016
2 Civil Works for Onshore Drilling and Workover Rig Sites 2014

 

OMV (Pakistan)

Exploration GmbH

October-2016
3 Civil & Earth works at Kirthar Concession areas on call-out basis

 

ENI Pakistan Limited March-2015
4 Civil & Earth works at Tajjal & East Sindh Concession areas on call-out basis

 

ENI Pakistan Limited March-2015
5 Provision of Sewage Treatment & Disposal System at BHP Zamzama Gas Plant, Pakistan

 

BHP Billiton Petroleum (Pakistan) Pty. Ltd March-2013
6 Provision of Construction of Evaporation Pond at ZGP BHP Billiton Petroleum (Pakistan) Pty. Ltd February-2012
7 Civil & Earth works at Kirthar Concession areas on call-out basis

 

ENI Pakistan Limited March-2013
8 Civil & Earth works at Tajjal & East Sindh Concession areas on call-out basis

 

 

ENI Pakistan Limited March-2012
9 Upgradation of Airfield Pavements at Zamzama BHP Billiton Petroleum (Pakistan) Pty. Ltd May-2011
10 Kohat Tunnel and Access Roads Project, Kohat, Pakistan JICA/NHA

(As sub-contractor to Taisei)

March-2003
11 “Construction of Bhit Airstrip Project for Lasmo/ENI in Kirthar Concession Area.”, Bhit, Sindh, Pakistan

 

Lasmo/ENI Pakistan Limited June-2002
12 “Indus Highway (N-55) Project Contract No. 1” Formation of embankment  1,300,000 cubic meters, Sub-base course, Asphalt concrete works 57km (7.3m width), 11 bridges, 185 Box Culverts, Kotri-Manjhand, Sindh, Pakistan

 

National Highway Authority July-1999
13 “Construction of all Weather Metalled Airstrip at PPL’s Kandhkot gas field, Jacobabad, Sindh Pakistan”

 

Pakistan Petroleum Limited March-1997
14 “Metropolitan Water Supply Project, Bulk Water Supply Phase III, Package II, Simly” Laying of Ductile iron pipes of dia 1200 mm within line valves, tee bends, wash outs, etc. for 16,000 m from Simly Dam, Islamabad to Sector F-5 near Punjab House, Islamabad, Pakistan

 

Capital Development Authority, Islamabad Pakistan October-1995
15 “Construction of Bridges Project in N.W.F.P, Village Peshora, District Battgram”  Mansehra, N.W.F.P., Pakistan

 

Tobishima Corporation, Japan June-1995

 

S. # General Description of Works Name of Client Date of Completion
16 “Indus Highway (N-55) Project Contract No. 6 Ghouspur – Shori Nullah” Length of road 76 Km, Earth work (Embankment) 1212300m³, No. of bridges 5, Box culverts 76, Concrete 9000m³, Sand (sub base) 90900m³, Crush base course 202500m³ , Asphalt Concrete 89700m³, Reinforcement steels 800 Tons (Sindh Pakistan)

 

National Highway Authority, Islamabad June-1995
17 “The Genetic Resources Preservation and Research Laboratory Establishment Project” Construction of main laboratory Building, Green Houses, Overhead Water Tank, other auxiliary buildings and Exterior works (Islamabad, Pakistan)

 

Tobishima Corporation, Japan November-1992
18 “Oil Fired Thermal Power Station Project Multan-2” (3*210 M.W. ) Main building turbine and deaerator section. Circulation pump house with switching chamber (unit 1).  Mechanical Induce, Cooling tower switch gear building (unit 1) (Muzzafargarh, Punjab, Pakistan.)

 

WAPDA/ National Engineering Services Pakistan (Pvt.) Ltd. October-1992
19 “Islamabad Model Integrated Rural Area Development Project, Southern area of Islamabad” Construction of road W=4.5m 181.1 Km Total earth work 140,000m³ Total concreting 1,000m³ (Islamabad, Pakistan)

 

Taisei Corporation Japan 1990
20 “Agriculture Development Project in Nasirabad” Farm area development- Lump sum, Main road 10 km, Farm road 36 Km, Irrigation canal 6 Km, Mechanical irrigation system- fixed type sprinkler, Rain gun traveler system, Portable sprinkler system, drip system, etc. (Baluchistan, Pakistan)

 

Tobishima Corporation, Japan Phase-I

February 1989

Phase-II

March-1990

21 “Oil Fired Thermal Power Station Project, Jamshoro, Unit 2 to Unit 4, Kotri Tehsil, Dadu District” Turbine Hall, storage house workshop, turbine workshop, tool storage , gas station, water pump station, site office, oil tank, etc. (Sindh Pakistan)

 

Mitsui & Co. Ltd. Japan September-1989
22 “Oil Fired Thermal Power Station, Jamshoro Unit 1, Kotri Tehsil, Dadu District” Intake water bridge (local portion), Intake control house, Access road, storage yard, Warehouse, Mitsui site office etc. (Sindh Pakistan

 

Mitsui & Co. Ltd. Japan March-1989
23 Providing & laying of water supplies & drainage lines in scheme 33 and Surjani Town

 

Karachi Development Authority March-1988

The OMV (Pakistan) Exploration Gesellschaft m. b. H.

Civil Works for Onshore Drilling and Workover Rig Sites 2014

(October 2014 to date)1

Upgradation of Airfield Pavements at Zamzama (May 2011)

2

Logistics Support to TWMA Integrated Drilling Waste Management

Aberdeen U.K. Project at Zamzama Dadu for BHP Billiton (2009)

4

Construction/Upgradation of Bhit Airstrip Project, Kirthar Concession Area, Bhit, Sindh (February 2002 to June 2002)

Construction of all Weather Metaled air Strip for PPL at Kandhkot Gas Field, Jacobabad (December 1996-March 1997)

5

5

 

 

 

Kohat Tunnel & Access Road Project (1999-2003) (Cont.)

7

Kohat Tunnel & Access Road Project (1999-2003) (Cont.)

8 9

 

High Voltage Transmission Lines & Other Projects Executed

Under Engr. Abdul Aziz Khatri, Director Projects

(As C.E.O of CPM from January-1998 to September-2015)

 

JOBS COMPLETED DURING 2015

 

Sr. No. GENERAL DESCRIPTION OF WORK Client Year of Completion
1 Construction of THE BOOK MALL at Urdu Bazaar Karachi Space Settlers 2015
2 Design, Engineering & Civil Construction At Kanupp Extension / Modification In 132 / 11 Kv S/S SIEMENS 2015
3 Replacement of 400 MM2 CU -conductor of 220Kv CCP – KCR lines from location no. 36-50 for transmission OH K-Electric 2015
4 Repairing of OPGW for 08 Nos. circuits (220 KV Lalazar – Maripur circuit) K-Electric 2015
5 132 KV T/Line Larkana – Dadu – Mehr (Sindh) HESCO 8 LS CABLE KOREA 2015
6 Repair / Replacement / Reconstruction of Stubs / Main members 5 Nos of Towers (Tower No. 19, 20, 21, 22, 23) of 132 KV PRL-Korangi west K-Electric 2015
7 Repair / Re-construction / Reinforcement of foundations (Raised piles) of 07 Nos. of tower and excavation of buried foundation 04 Nos. of towers of 220kv CCP-KCR T/Line K-Electric 2015
8 Construction, Erection, Stringing & Commissioning of 132 kv D/Circuit Transmission line form Noori Abad to KDA Scheme 33 Grid Station of  K – Electric Techcoman / STDC 2015
JOBS COMPLETED DURING 2014
SR. NO. GENERAL DESCRIPTION OF WORK NAME OF CLIENT YEAR OF COMPLETION
1 132 / 220KV Sub Station at Dera Murad Jamali PEL – TAIKAI 2014
2 132KV WANA Substation at South Waziristan PEL / NEIE 2014
3 Construction of Civil Works for 220KV Shalamar Substation Lahore PEL 2014
4 Electrification Scheme at Baba Bhit Island K – ELECTRIC 2014
5 132 KV Talhar Grid Station  (Sindh) (Hesco 10) SIEMENS 2014
6 132 KV Larkana, Sukkur & Jacobabad Grid Stations  (Sindh) (Hesco 7) SIEMENS 2014
7 Replacement of Nuts & Bolts for 220Kv BQPS – KCR T/Line K-Electric 2014
8 Replacement of X-Arms for 132 KV BALDIA – VALIKA – ORANGI T/Lines K – ELECTRIC 2014
9 Re spooling of cu. conductor 400mm K-Electric 2014
10 Re spooling of cu. conductor 300mm K-Electric 2014
JOBS COMPLETED DURING 2013
1 Laying of 11 KV underground Cable works at different areas of Karachi. KESC 2013
2 Rehabilitation of OPGW for Different Lines KESC 2013
3 Replacement of Nuts & Bolts for 220Kv BQPS – KCR T/Line KESC 2013
4 Rehabilitation of Span Conductor to Meet the rated Capacity at 220 BQPS 2 – KCR CKT 1 & 2 KESC 2013
5 Cleaning of Insulator for 132 KV KNPC-BALDIA Circuit 1 & 2, 220 KV BALDIA – MARIPUR Circuit 1 KESC 2013
6 220 KV S/C Overhead T/Line for Baldia – Maripur KESC 2013
7 220 KV T/LINE from Qabu Saeed Khan to Khuzdar (Complete Job) NTDC / MECON 2013
8 Horizontal Boring And Laying of 11 Kv Cable Feeders. KESC 2013
9 132 KV D/C Overhead T/Line for Clifton Grid Station Karachi KESC 2013
 

JOBS COMPLETED DURING 2012

1 Sorting / Segrigation of Assembly Fitting & Hardware at KESC’s KDA Store KESC Jan-12
2 Cleaning of Insulator String at 220 KV KCR – LALAZAR & KCR – KPT T/Line KESC Jan-12
3 132 KV T/Line at Gulistan – e – Jouhar for Hospital Grid KESC Feb-12
4 Civil Earthwork at Tajjal & East fill concession area for ENI at Kadanwari Distt Khairpur for oil exploration project Saita Pak Mar-12
5 Supply & Installation of 132KV High Voltage Bus Bar at Agha Steel Bin Qasim Karachi Seimens Apr-12
6 220 KV T/LINE at Pattan – Besham (Foundation Work) NTDC / NEIE Oct-12
7 220 KV T/LINE at Pattan – Besham (Erection Work) NTDC / NEIE Oct-12
8 220 KV T/LINE at Pattan – Besham (Stringing Work) NTDC / NEIE Oct-12
9 Rehabilitation 220 KV KDA – Pipri Circuit 2 location # 12 & 13 KESC Nov-12
10 Installation of PMT at different locations in KARACHI. KESC 2012
 

 

 

 

 

 

High Voltage Transmission Lines & Other Projects Executed

Under Engr. Abdul Aziz Khatri, Director Projects

(As C.E.O of CPM from January-1998 to September-2015)

 

 

JOBS COMPLETED DURING 2011

1 Laying of 11 KV underground Cable works at different areas of Karachi. KESC 11-Dec
2 Design, Supply (Partially) Erection, Testing, & Comissioning of 132 KV D/C O/H T/L with OPGW from Sea Shore KTPS to 132 KV Switch Yard Building. NTDC / KESC Jan-11
3 Construction of Foundation, Erection & Stringing work of KPS T#1 at KTPS KARKEY Jan-11
4 Bush Cutting Work at DHA Phase VIII Karachi DHA Apr-11
5 Repair of Damaged Fiber Optic Cable Laid Between KESC Qayyumabad Grid & DHA Grid No. 1 Phase-8 DHA Jul-11
6 Commercial building at Bahadur abad Karachi Space Settlers Sep-11
7 Break down work for 132 KV BOC – PIPRI Transmission Line KESC Nov-11
JOBS COMPLETED DURING 2010
1 Replacement of Hardware for 06 Nos. Transmission Lines at Karachi KESC Jan-10
2 132 KV Transmission Line Korangi Town – Baloch Colony – Korangi West KESC Feb-10
3 Cleaning of Insulator for 07 Nos. 220 KV Transmission Line KESC Mar-10
4 Repair work at tower 220 KVBQPS-Pipri West Circuit II KESC Mar-10
5 Re-Routing of 07 Nos. Towers for Under Construction Bridge at Banaras Chowk KESC Mar-10
6 Supply of Jumper Termination, PG clamps, & T Connectors Bronze KESC Apr-10
7 Construction of Collapsed Tower at Hub Baluchistan KESC Apr-10
8 Establishment of Mechanical Lab at DHA City office Karachi DHA City Jun-10
9 Establishment of Research Cell at DHA City office Karachi DHA City Jun-10
10 Design, Manufacture, Supply, Erection, Testing & Commissioning of 132KV D/C T/L Between KTPS to Qayyumabad Grid Station LS CABLE / KESC Sep-10
11 Listing of transmission Line Material KESC Oct-10
12 OPGW for 16 Nos. Fibers, Including Approach Cable FOC with End to End testing. KESC Oct-10
13 Inst. Of Foundation, Erection & Stringing of Pole at Korangi Baloch Line KESC Oct-10
JOBS COMPLETED DURING 2009
1 Replacement of Insulators for 132KV Kanupp – Baldia line Karachi KESC Apr-09
2 Repairing of 132 KV Transmission line Fault at Karachi KESC Apr-09
3 132 KV Transmission line Hybrid Project at Karachi (04 Lines) KESC / NEIE Jun-09
4 Transmission Line, feeding PRL Mobil Grid Station. KESC Jul-09
5 Replacement of OPGW & Splicing of 2 way Joint Box KESC Aug-09
6 Rectificatiion of Existing Tower KESC / NEIE Aug-09
7 Rehabilitation of 220 KV line BQPS-KCR ckt – 1 KESC Sep-09
8 Rehabilitation of 220 KV Lalazar – Maripur ckt-1 (I) KESC Oct-09
9 Repairing of Optical Fibre Ground Wire for KESC KESC Nov-09
10 Transmission line yellow & Red phase Conductor & X-arms replaced KESC Nov-09
11 Rehabilitation of 220 KV Lalazar – Maripur ckt-1 (II) KESC Nov-09
12 Residential Building Namely Al-Amna Terrace, GRW 139 Garden West Karachi GAC Dec-09
13 220KV Dadu Sub Station Extension NEIE Dec-09
JOBS COMPLETED DURING 2008
1 220 KV Tower Foundation work at Bata Gram Mansehra (11 Sites) NTDC / NEIE Feb-08
2 132 KV T/Lines at S.I.T.E Gas Turbine Karachi KESC Feb-08
3 11 KV U/G Cable laying work at Gulistan-e-Johar Karachi (37 Scheme) KESC Mar-08
4 Rehabilitation / Stringing work for Korangi South Loop line Karachi KESC Jul-08
5 220 KV Tower Stringing work at Besham (18 Sites) NTDC / NEIE Jul-08
6 11 KV U/G Cable laying work at different locations Karachi (03 Scheme) KESC Jul-08
7 11 KV U/G Cable laying work at different locations Karachi (11 Scheme) KESC Aug-08
8 11 KV U/G Cable laying work at different locations Karachi (08 scheme) KESC Sep-08
9 Modification work on PLDP at Qayyumabad KESC Oct-08
10 11 KV U/G Cable laying work at different locations Karachi (09 Scheme) KESC Oct-08
11 Residential Building Namely Ameena Terrace, GRW 147 Garden West Karachi GAC Nov-08
12 11 KV U/G Cable laying work at different locations Karachi (16 Scheme) KESC Nov-08
13 Renovation work of EOBI Offices at different locations countrywide PRIMACO Dec-08
14 11 KV U/G Cable laying work at different locations Karachi (09 Scheme) KESC Dec-08
15 11 KV U/G cable laying work at Korangi Karachi (77 Scheme) KESC Dec-08
 

 

 

 

 

 

High Voltage Transmission Lines & Other Projects Executed

Under Engr. Abdul Aziz Khatri, Director Projects

(As C.E.O of CPM from January-1998 to September-2015)

 

 

JOBS COMPLETED DURING 2007

1 Brick Soling & Concrete Flooring with SR Cement at MCR PARCO Feb-07
2 Warid Telecom tower on CAME Basis at LAHORE Region (10 Sites) IIC / WARID Mar-07
3 500 KV  Over Head T/ Line Muzaffar Garh – Gatti  Foundation work NTDC / NHC Apr-07
4 11 KV U/G Cable laying work at Gulshan-e-Iqbal  (07 Schemes) KESC Apr-07
5 11 KV U/G Cable laying work at Old Town  (43 Schemes) KESC Jun-07
6 220 KV Tower Foundation work at THAKOT MANSEHRA (10 Sites) NTDC / NEIE Jul-07
7 CM Pak Telecom Towers Electric work only (14 Sites) LEBLANC Aug-07
8 220 KV Tower Foundation work at Besham (18 Sites) NTDC / NEIE Aug-07
9 11 KV U/G Cable laying work at North Karachi  (29 Schemes) KESC Oct-07
10 132KV AIS Sub Station at Kamra PEL Oct-07
11 CM Pak Telecom Towers at BAHAWALPUR & SAHIWAL (28 Sites) IIC / CM Pak Nov-07
12 Roof Treatment of HSE Building at  PARCO MCR PARCO Nov-07
13 Civil works for LPG PLANT AT MCR Mehmood Kot PARCO Nov-07
14 Civil works for SPOON BASIN AT MCR Mehmood Kot PARCO Nov-07
15 220 KV Tower Erection work at Besham (18 Sites) NTDC / NEIE Dec-07
16 500 KV T/ Line Muzaffar Garh – Gatti  914 dia Piles & Tie Beams NTDC / NHC Dec-07
                                                    JOBS COMPLETED DURING 1998 TO 2006
1 Const of Facilities for Hydro Jetting Station at MCR PARCO Sep-02
2 Const. Of Housing Complex at Mehmood kot for PARCO PARCO Dec-02
3 Modification in Incinerator & Misc. Repair Works at Korangi PS-1 Karachi PARCO Jan-03
4 Const / Extension of Ware House at Korangi PS-1 Karachi PARCO Feb-03
5 Renovation of Ware House & Equipment Shed at Korangi  PS-1 Karachi PARCO May-03
6 Const / Extension of Office & MPT Residence at Faisalabad TS-3 PARCO Jul-03
7 Heat Proof Treatment in Control Bldg. at Gantry Faisalabad TS-3 PARCO Jul-03
8 Extension of N-MPT Hostel at Faisalabad TS-3 PARCO Oct-03
9 Repair / Modification Work at Faisalabad TS-3 PARCO Oct-03
10 Repair & Maintenance of Building at Fazilpur PS-4 PARCO Oct-03
11 Const of Canteen Building & Admin Storage Block at MCR PARCO May-04
12 Extension of Existing Guest House in Housing Complex at MCR PARCO Jun-05
13 Const of Store for Officers Club in Housing Complex at MCR PARCO Jun-05
14 220 KV D/C T/Lines Muzaffargarh – Gatti – Bhawalpur WAPDA / NHC Oct-05
15 Const of Bachelor Accommodation Block in Housing Complex MCR PARCO Dec-05
16 Const of Tank Lorry Driver’s Facility near Parco MCR PARCO Dec-05
17 Construction of Marketing & Commercial Building at MCR PARCO Feb-06
18 Construction of Dormitory in 3rd Block of Hospital at MCR PARCO Jul-06
19 Spoon Basin works at MCR PARCO Nov-06
20 132KV Substation sawabi City MACE Nov-06
21 132KV AIS Substation Shankari MACE Dec-06

 

 

 

10 11 12 13 14

 

Top